Gold Mining Contractors Required

1 of
Previous Next

Ad Details

  • Ad ID: 7446

  • Added: November 8, 2019

  • Views: 21

Description

Gold Mining Contractors Required, Underground and Open Cast

A Gold mine is looking for reputable Contractors to establish infrastructure and mine on an Ore (Gold) Split basis.

Underground grades of between 7 and 30 gpt, depending on mining technique used.
Options include
Continuous Rope bag mining, Vacuum machines/ vamping, Drill and blast, Scraper mining, Trackless mining, open cast mining, heap leach open cast mining and processing.

Tonnes can be mined between 400 and 5000 tpm per underground shaft.
Open cast can be mined at tonnages between 10 ,000 and 50,000 tonnes per month.

Heap Leach can be mined and processed at tonnages up to 50 000 tonnes per month.

A TMM underground operation could mine at 15 000 TPM, but would require an access shaft to be developed.

6 underground Shafts available for Contract Mining.

A CIL plant is available for processing up to 3000 TPM ofore and can be operated by the Contractor.

Alternatively the Contractor should have a toll treatment or own treatment plant to process their share of the ore.
Within 35 km of Johannesburg Central.
Only reputable, track -record Contractors will be considered.

www.miningclx.com
Email us at info@miningclx.com or call 011 748 8800
Flow Sort X-Ray Recovery plant for sale

Tags :